THE BREWERY
Early Construction
This was taken after we first bought the land and put in our driveway
Stick Frame
Building
This is the first picture after the outside metal was put on
Putting on the ceiling
Putting on the ceiling
Insulation
Insulation
Having a little too much fun on the scaffolding
Insulation
Cold room
John and Sheree wrapping the cold room.
Electric
It was a cold day to put down the pipe needed to run our electric to the pole
Drywall
Drywall
Drywall
The whole family was out helping put up drywall this day, even Dr. Jones was out to help.
Equipment arrival
Exciting day for SOT receiving our brew system
Recieving Brew System
Celebrating the equipment arriving
New Equipment
Unboxing the new equipment
Posing in front of new equipment
Getting the equipment together
Jeff n JD posing with new equipment
Kegs arrived
New back patio poured
Sheree posing with our new sign
New sign framed and hung
Group figuring out new system
Programming recipes into PLC
Grilling out on the tailgate
Group discussion
Test Sparge
Sparge pose
Fly sparging for the first time
Sparging
Showing off our new pint glasses
First founder member Jerry
Founders Club -Josh-
Founders club -Chad and Greg-
Founders club -Perry-
Founders club -Mike-
Founders club -John-