top of page

Sons Of Toil Brewing LLC
THE BREWERY

Early Construction
This was taken after we first bought the land and put in our driveway

Stick Frame

Building
This is the first picture after the outside metal was put on

Putting on the ceiling

Putting on the ceiling

Insulation

Insulation
Having a little too much fun on the scaffolding

Insulation

Cold room
John and Sheree wrapping the cold room.

Electric
It was a cold day to put down the pipe needed to run our electric to the pole

Drywall

Drywall

Drywall
The whole family was out helping put up drywall this day, even Dr. Jones was out to help.

Equipment arrival
Exciting day for SOT receiving our brew system

Recieving Brew System
Celebrating the equipment arriving

New Equipment
Unboxing the new equipment

Posing in front of new equipment

Getting the equipment together

Jeff n JD posing with new equipment

Kegs arrived

New back patio poured

Sheree posing with our new sign

New sign framed and hung

Group figuring out new system

Programming recipes into PLC


Grilling out on the tailgate

Group discussion

Test Sparge

Sparge pose

Fly sparging for the first time

Sparging

Showing off our new pint glasses

First founder member Jerry

Founders Club -Josh-

Founders club -Chad and Greg-

Founders club -Perry-

Founders club -Mike-

Founders club -John-

DSCN5633
bottom of page